Core Pillar Center

From Blaseball Wiki

Revision as of 11:29, 27 December 2021 by Donnie Down Under (talk | contribs) (Added all Renovations.)


Core Pillar Center, or 'The Pillars', is the Ballpark of the Core Mechanics.

Official League Record

The Core Pillar Centre was established by the Core Mechanics in the Season 13 Latesiesta, at a cost of 665,911 Coins. Fans of the Mechanics selected the Hillcrest prefab.

Renovations

  • During Season 14 construction, fans of the Mechanics selected the PsychoAcoustics and Coffee Threes + renovations.
  • During Season 15 construction, fans of the Mechanics selected the Echo Chamber and Secret Base renovations.
  • During Season 16 construction, fans of the Mechanics selected the Sweetener and Salmon Cannon renovations.
  • During Season 17 construction, fans of the Mechanics selected the Obtuseness-, Fax Machine and Hotel Motel renovations.
  • During Season 18 construction, fans of the Mechanics selected the Ballpark Cleanup and Coffee Two + renovations.
  • During Season 19 construction, fans of the Mechanics selected the Fortification+, Hoops and LCD Soundsystem renovations.
  • During Season 20 construction, fans of the Mechanics selected the Grandiosity+, Tunnels and Balloons renovations.
  • During Season 21 construction, fans of the Mechanics selected the Voicemail, Peanut Mister and Flood Balloons renovations.
  • During Season 22 construction, fans of the Mechanics selected the Light Switch (OFF), Phantom Thieves Guild and Flood Pumps renovations.
  • During Season 23 construction, fans of the Mechanics selected the Light Switch (ON), Stables and Condensed Floor Plans renovations.

COMMUNITY REPORTS
The remainder of this article contains lore created collaboratively by the Blaseball community.

History

Origin of the Core Pillar Center

Features

The Pillar

Ballpark Layout

Stadium Usage

Blaseball

Non-blaseball uses

Accessibility and Transportation

How to get to the Core Pillar Center

Disability access

See Also

Fan Works